(1) The Regional Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring stability of grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control.
(2) Every licensee, generating company, generating station, sub-station and any other person connected with the operation of the power system shall comply with the directions issued by the Regional Load Despatch Centres.
Legal Commentary & Landmark Judgments: Section 29
Section 29 of the Electricity Act, 2003 establishes the mandatory, binding nature of RLDC operational directions upon transmission licensees, distribution licensees, generating companies, and sub-station operators, providing penal consequences and CERC dispute resolution for non-compliance.
In high-stakes grid operation disputes, advise generating plants or state utilities never to resist RLDC real-time instructions; instead, execute the instruction under formal written protest, record timestamped logs, and immediately initiate dispute proceedings before CERC under Section 29(5).